“O Koumaros” Association of Tinos

What the Association has done

Since 1977, with members’ fees, income from events, donations and a great deal of volunteer work, the Association has looked after Koumaros. Some works it carried out itself; for others it pressed the municipality and the community until they were done.

Would you like to help with the next one?

2020–2029

  1. 2026
    The road to the Evangelistria chapel cleared

    In June the Association had the road to the Evangelistria chapel cleared. A volunteer also cleared the path to the well.

  2. 2025
    Chalice and carpets for the church

    The Association gave a chalice to the village church, the Transfiguration of the Saviour, and saw to its carpets.

  3. 2025
    Wooden handrails on stone posts

    In May the board, together with members and volunteers of the Association, replaced the old wooden handrail with new wooden handrails on stone posts.

  4. 2025
    Path to the well and sewer repair

    At the Association’s request, the Municipality of Tinos and the Falatados community repaired the sewer and cleared the path to the well.

  5. 2025
    The village well restored

    New paving, whitewash and cleaning at the old village well. The work was finished in October by volunteers, with materials provided by the Municipality of Tinos.

  6. 2024
    Volunteers in the lanes

    In May volunteers cleared the stone path down to the well. In August they whitewashed steps and walls, and the road to the village was cleared.

    Photos →
  7. 2024
    The clubhouse renovated

    In April the Association’s clubhouse was renovated, with a new kitchen and counter.

  8. 2023
    The village entrance and the Evangelistria steps

    In July the Evangelistria steps were repaired. In August volunteers laid new concrete on the worn road at the village entrance.

    Photos →
  9. 2022
    The church bells repaired

    In June the two bells of the Church of the Transfiguration of the Saviour were taken down for a necessary repair. The large one shows the Transfiguration in relief, twice, with plant decoration at the top and bottom and the inscription “Voice of the Lord. Foundry of Stavros D. Chrysos. In Syros. 1879”. The small one has no decoration but is much older: it bears the date 1766.

2010–2019

  1. 2019
    The Evangelistria chapel repainted

    In mid-August, just before the 17 August feast, members of the Association repainted the Evangelistria chapel.

  2. 2011–2019
    The Association’s guesthouse

    In 2012 an abandoned house in the centre of the village passed to the Association. Through volunteer work days and many stages (roof, walls, plaster, electricity, plumbing, floors) it became a small guesthouse, let since 2019, which helps fund the Association’s work.

  3. 2017
    The lower village entrance

    At the Association’s request, the Falatados community and the Municipality of Tinos resurfaced the worn road with concrete.

  4. 2016
    Clubhouse roof sealed and painted; new basketball nets

    The clubhouse roof was sealed and the whole building painted. The basketball court got new nets.

  5. 2014–2015
    Volunteer days at the guesthouse

    On 2 August 2014, and again on 2 August 2015, the board called on everyone who could help to a day of volunteer work at the Association’s property, the house that later became the guesthouse, to move its restoration forward. Both years many people took part, and a generous treat followed the work.

  6. 2014–15
    The central arch

    In January 2014 a beam collapsed in the second arch over the main street. The Association alerted the Municipality and planning office, and the Falatados community took on the repair.

  7. 2010
    The entrance slope paved

    After a letter from the Association, the Municipality of Exomvourgo paved the slope at the village entrance. That year the court and playground were also maintained with gifts from friends of the Association.

2000–2009

  1. 2009
    Stone walls, steps and pavingPhotos →
  2. 2008
    The Evangelistria courtyard and a handrail to the church

    Pressed and supervised by the Association, the Municipality paved the steps and courtyard of the Evangelistria chapel. The Association put a handrail on the steps from the road to the church and built bollards on the road from the playground.

1990–1999

  1. 1999–2000
    Lighting, paving and the clubhouse

    Lighting was extended in the village, on the hill and at the playground. A street on the north side was paved. The clubhouse got heating and a pergola and was repainted, as was the playground.

  2. 1998
    Ossuary; road at Lagkadakia
  3. 1995
    A borehole for the village water

    On the Association’s initiative, with the local authorities.

  4. 1995–96
    Playground and basketball court

    For the Association’s 20th anniversary.

  5. 1992–93
    The stone arches restored

    The stone arches were restored; one of them was widened and raised.

    Photos →
  6. 1991–93
    The village paved

    Streets and lanes were paved on the Association’s initiative, with the community. They were inaugurated on 5 August 1993.

1980–1989

  1. 1987
    Four marble fountains; the square at Lagkadakia

    The square was made as a car park.

  2. 1986
    A new road
  3. 1982
    Sewerage

    The village sewer network, with the community.

1970–1979

  1. 1979
    Lighting for the arches; Agios Georgios and the cemetery

    The first public lighting to show off the arches. The church of Agios Georgios and the cemetery were renovated.

  2. 1977–79
    The Association’s clubhouse

    The first project: an old shop in the village centre was donated and became the clubhouse, where everyone serves themselves.

  3. 1970–71
    Before the Association: the road to Pano Meri

    The villagers raised money, hired a bulldozer and opened the road with volunteer labour.

Remember a work that is missing, or have photos? Write to us.